Quantcast
Channel: BizTalk Scheduled Task Adapter
Browsing index pages (138 articles)
↧

Created Unassigned: Schedule Task Adapter 6.0 Start time issue [11196]

If I configure Start time at 00:00 together with a time span of 6 hours I expect the run time of 00:00, 06:00, 12:00 and 18:00. This were in the last versions the fact. With the new stable release...

View Article


Created Unassigned: Time Zone issue [11195]

Similar to the previously posted issue. I configured the receive location to run every 15 minutes. For some reason the adapter decided that it's first execution time is 6 hours later. Our local time is...

View Article


Created Unassigned: Azure Time Zone [11191]

We use the schedule adapter in an Azure VM but as much as we tried to configure it to read the VM time, the adapter read the Azure host time (3 hours more than VM). We use BTS2016 with Feature Pack 1...

View Article

New Post: Codeplex shutting down

Any update on this? Is it going to go to Github like most other BizTalk projects? See Codeplex shutting down – BizTalk Tools

View Article

Commented Unassigned: 60\120 messages when starting port [11170]

Hi Sandro Just using V6.0 on BizTalk 2016.When I stop and start the project which has a scheduled receive location using the File stream provider I receive either 60 or 120 messages instantaneously...

View Article


Commented Unassigned: Multiple Messages & Schedule issue at restart [11172]

Hi Sandro,I'm using the Adapter V6.0.0.0 on a BTS 2016 environment, with the following configuration : XmlStringStreamProvider class, Schedule type "TimeSpan", Interval 1 hours, every day. I noticed...

View Article

Created Unassigned: Problem with xml string stream provider [11182]

Hi all,I faced issue after instaling this adapter into out test environment.(BizTalk 2016)Everything lookes good but xml string stream provider doesnt work as expected.I am not able to insert multiline...

View Article

New Post: BizTalk Scheduled Task Adapter for Biztalk 2013(not R2)

Is there a release that contain the fix of bug "In some scenarios, trigger message sent twice at the same time" for Biztalk 2013 (not R2)?

View Article


Commented Unassigned: 60\120 messages when starting port [11170]

Hi Sandro Just using V6.0 on BizTalk 2016.When I stop and start the project which has a scheduled receive location using the File stream provider I receive either 60 or 120 messages instantaneously...

View Article


Commented Unassigned: 60\120 messages when starting port [11170]

Hi Sandro Just using V6.0 on BizTalk 2016.When I stop and start the project which has a scheduled receive location using the File stream provider I receive either 60 or 120 messages instantaneously...

View Article

Commented Unassigned: 60\120 messages when starting port [11170]

Hi Sandro Just using V6.0 on BizTalk 2016.When I stop and start the project which has a scheduled receive location using the File stream provider I receive either 60 or 120 messages instantaneously...

View Article

Created Unassigned: Multiple Messages & Schedule issue at restart [11172]

Hi Sandro,I'm using the Adapter V6.0.0.0 on a BTS 2016 environment, with the following configuration : XmlStringStreamProvider class, Schedule type "TimeSpan", Interval 1 hours, every day. I noticed...

View Article

Commented Unassigned: 60\120 messages when starting port [11170]

Hi Sandro Just using V6.0 on BizTalk 2016.When I stop and start the project which has a scheduled receive location using the File stream provider I receive either 60 or 120 messages instantaneously...

View Article


Created Unassigned: 60\120 messages when starting port [11170]

Hi Sandro Just using V6.0 on BizTalk 2016.When I stop and start the project which has a scheduled receive location using the File stream provider I receive either 60 or 120 messages instantaneously...

View Article

New Post: Could not remove application with scheduler adapter with custom...

Dear community, I faced with this problem, I can not remove application with scheduler adapter which includes custom provider (which is an implementation of IScheduledTaskStreamProvider2). But, when I...

View Article


New Post: Codeplex shutting down

Hi, Since CodePlex is shutting down, have you considered a new home for the source code of this adapter?

View Article

Source code checked in, #79773

BTS2016 Last version

View Article


New Post: BizTalk Server 2016

Hello, new adapter 6.0 is not working, schedule is not triggering at all. tried with 32 and 64 bits and all types of schedules like timespan/daily/weekly.

View Article

New Post: BizTalk Server 2016

Hi, I am not able to download v 6.0

View Article

Updated Release: Release 6.0.0 for BizTalk Server 2016 (Mar 04, 2017)

Requirements:The Scheduled Task Adapter v6.0.6 is optimized and designed to be used with BizTalk Server 2016 (Compiled in .NET Framework 4.6).V6.0.0 Changelog:Compiled in Visual Studio 2015 and .NET...

View Article
Browsing index pages (138 articles)


Latest Images